Original design for OBX Totem |
Start of Loggerhead Turtle, January 2008 |
|
Model for OBX Totem |
||
Stone Delivery |
Blocks on Bankers |
Setting OBX Totem
The installation of the OBX Totem started On Labor day weekend, 2009. I arranged for the stone to be loaded at my home by a local Funeral home with a boom truck. Transported by trailer to North Carolina and unloaded by Kitty Hawk Iron Works.